| Line 7: | Line 7: | ||
| I am writing on behalf of North East Marine Research Group (NEMRG) to seek the following information relating to the Tees Maintenance Dredge Protocol (MDP) Baseline Document (dated May 20, 2025) and to PD Ports Ltd’s maintenance dredging operations. | I am writing on behalf of North East Marine Research Group (NEMRG) to seek the following information relating to the Tees Maintenance Dredge Protocol (MDP) Baseline Document (dated May 20, 2025) and to PD Ports Ltd’s maintenance dredging operations. | ||
| - | 1. Trailing Suction Hopper Dredger (TSHD) Operational Data | + | ==== 1. Trailing Suction Hopper Dredger (TSHD) Operational Data ==== |
| The MDP acknowledges the use of the Emerald Duchess and Heortnesse but omits technical details on hopper overflow. Please provide the following: | The MDP acknowledges the use of the Emerald Duchess and Heortnesse but omits technical details on hopper overflow. Please provide the following: | ||
| Line 14: | Line 14: | ||
| * Request 1.3: All internal reports and studies used by PD Teesport to validate the claim of environmental sustainability of the dredging operations, specifically that green valves contribute to environmental sustainability by reducing the mass flux of contaminants, | * Request 1.3: All internal reports and studies used by PD Teesport to validate the claim of environmental sustainability of the dredging operations, specifically that green valves contribute to environmental sustainability by reducing the mass flux of contaminants, | ||
| - | 2. Estuarine Plume Modelling and Hydrodynamics | + | ==== 2. Estuarine Plume Modelling and Hydrodynamics |
| The MDP provides plume modelling for the offshore disposal site (Tees Bay A) but contains no equivalent modelling for the inner estuary reaches. | The MDP provides plume modelling for the offshore disposal site (Tees Bay A) but contains no equivalent modelling for the inner estuary reaches. | ||
| * Request 2.1: Disclose all 3D hydrodynamic or sediment transport modelling held by PD Teesport that specifically simulates the " | * Request 2.1: Disclose all 3D hydrodynamic or sediment transport modelling held by PD Teesport that specifically simulates the " | ||
| * Request 2.2: Provide all data regarding the " | * Request 2.2: Provide all data regarding the " | ||
| - | 3. Contaminant Partitioning and "Fine Fraction" | + | ==== 3. Contaminant Partitioning and "Fine Fraction" |
| The MDP relies on bulk sediment sampling and Cefas Action Levels designed for offshore disposal rather than known toxicity of contaminants. It fails to account for the fact that hydrophobic contaminants (PAHs, PCBs, PBDEs) adsorb preferentially to the fine particles (<63µm) that are systematically released via overflow. | The MDP relies on bulk sediment sampling and Cefas Action Levels designed for offshore disposal rather than known toxicity of contaminants. It fails to account for the fact that hydrophobic contaminants (PAHs, PCBs, PBDEs) adsorb preferentially to the fine particles (<63µm) that are systematically released via overflow. | ||
| * Request 3.1: Disclose all chemical analysis held by PD Teesport that was conducted specifically on the overflow water/fine sediment fraction, rather than bulk bed samples. | * Request 3.1: Disclose all chemical analysis held by PD Teesport that was conducted specifically on the overflow water/fine sediment fraction, rather than bulk bed samples. | ||
| * Request 3.2: Provide the raw data for the Year 9 (2024) mid-licence sampling, specifically the Total Organic Carbon (TOC) levels used to normalise PBDE concentrations, | * Request 3.2: Provide the raw data for the Year 9 (2024) mid-licence sampling, specifically the Total Organic Carbon (TOC) levels used to normalise PBDE concentrations, | ||
| - | 4. Water Framework Directive (WFD) and Protected Sites | + | ==== 4. Water Framework Directive (WFD) and Protected Sites ==== |
| The Tees Transitional water body is currently failing for PBDEs, mercury, and benzo(g, | The Tees Transitional water body is currently failing for PBDEs, mercury, and benzo(g, | ||
| * Request 4.1: Provide the "WFD Compliance Assessment" | * Request 4.1: Provide the "WFD Compliance Assessment" | ||
| Line 36: | Line 36: | ||
| ===== Response ===== | ===== Response ===== | ||
| - | |||
| - | 1st May 2026 | ||
| 1st May 2026 | 1st May 2026 | ||
| Line 79: | Line 77: | ||
| We can confirm that PD Teesport holds some, but not all, of the information responsive to the Request. Some of the information is excepted from disclosure | We can confirm that PD Teesport holds some, but not all, of the information responsive to the Request. Some of the information is excepted from disclosure | ||
| - | ==== Request 1.1 - " | + | === Request 1.1 - " |
| PD Teesport does not hold information responsive to this part of your Request, as it does not have log sheets which specify the duration of “overflowing” or “overspilling”. To assist you, we have enclosed an example hard copy of a log sheet for the Emerald Duchess. We can also advise | PD Teesport does not hold information responsive to this part of your Request, as it does not have log sheets which specify the duration of “overflowing” or “overspilling”. To assist you, we have enclosed an example hard copy of a log sheet for the Emerald Duchess. We can also advise | ||
| - | ==== Request 1.2 - The technical specifications and operational settings for the "green valves" | + | === Request 1.2 - The technical specifications and operational settings for the "green valves" |
| PD Teesport holds information which responds to this part of your Request. However, it considers that it may be subject | PD Teesport holds information which responds to this part of your Request. However, it considers that it may be subject | ||
| - | ==== Request 1.3: All internal reports and studies used by PD Teesport to validate the claim of environmental sustainability of the dredging operations, specifically that green valves contribute to environmental sustainability by reducing the mass flux of contaminants, | + | === Request 1.3: All internal reports and studies used by PD Teesport to validate the claim of environmental sustainability of the dredging operations, specifically that green valves contribute to environmental sustainability by reducing the mass flux of contaminants, |
| As above, PD Teesport holds information which responds to this part of your Request. However, it considers that it may be subject to the exception to disclosure under Regulation 12(5)(e) EIR. More information is provided under the “Commercial information” heading below. | As above, PD Teesport holds information which responds to this part of your Request. However, it considers that it may be subject to the exception to disclosure under Regulation 12(5)(e) EIR. More information is provided under the “Commercial information” heading below. | ||
| - | ==== Request | + | === Request |
| PD Teesport does not hold information responsive to this part of your Request. | PD Teesport does not hold information responsive to this part of your Request. | ||
| - | ==== Request | + | === Request |
| PD Teesport does not hold information responsive to this part of your Request. To assist you, we confirm that PD Teesport can provide data to show the chart areas that accumulate the most sediment and therefore are dredged the most if this would be of interest. | PD Teesport does not hold information responsive to this part of your Request. To assist you, we confirm that PD Teesport can provide data to show the chart areas that accumulate the most sediment and therefore are dredged the most if this would be of interest. | ||
| - | ==== Request | + | === Request |
| PD Teesport does not hold information responsive to this part of your Request. | PD Teesport does not hold information responsive to this part of your Request. | ||
| Line 107: | Line 105: | ||
| PD Teesport holds information responsive to this part of your Request and has enclosed relevant documents. | PD Teesport holds information responsive to this part of your Request and has enclosed relevant documents. | ||
| - | ==== Request 4.1: Provide the "WFD Compliance Assessment" | + | === Request 4.1: Provide the "WFD Compliance Assessment" |
| PD Teesport holds information responsive to this part of your Request. The Water Environment Regulations (WER) WFD Compliance Assessment was disclosed to your solicitors Goodenough Ring on 4 February 2026 in response to a previous EIR request and we’d direct you to that response. | PD Teesport holds information responsive to this part of your Request. The Water Environment Regulations (WER) WFD Compliance Assessment was disclosed to your solicitors Goodenough Ring on 4 February 2026 in response to a previous EIR request and we’d direct you to that response. | ||
| - | ==== Request 4.2: Disclose any evidence used to conclude that dredging-induced turbidity does not impact the foraging success of Common Terns over their entire estuarine range, particularly in the silty upper reaches. | + | === Request 4.2: Disclose any evidence used to conclude that dredging-induced turbidity does not impact the foraging success of Common Terns over their entire estuarine range, particularly in the silty upper reaches. === |
| - | PD Teesport holds information responsive to this part of your Request. | + | PD Teesport holds information responsive to this part of your Request. |
| - | ==== Request 4.3: Records of any Turbidity/ | + | === Request 4.3: Records of any Turbidity/ |
| PD Teesport does not hold information responsive to this part of your Request. | PD Teesport does not hold information responsive to this part of your Request. | ||
| - | ==== Request 4.3: Formal Record of Decision or Test of Likely Significance regarding Teesmouth and Cleveland Coast SPA. ==== | + | === Request 4.3: Formal Record of Decision or Test of Likely Significance regarding Teesmouth and Cleveland Coast SPA. === |
| PD Teesport holds information responsive to this part of your Request. The MDP has previously been disclosed to you. The SPA was extended in 2020 to cover foraging terns (amongst other reasons), whilst maintenance dredging and disposal operations were ongoing. | PD Teesport holds information responsive to this part of your Request. The MDP has previously been disclosed to you. The SPA was extended in 2020 to cover foraging terns (amongst other reasons), whilst maintenance dredging and disposal operations were ongoing. | ||
| Line 125: | Line 123: | ||
| We enclose | We enclose | ||
| - | ===== Exceptions | + | ==== Exceptions ==== |
| - | ==== Commercial information – Regulation 12(5)(e) | + | === Commercial information – Regulation 12(5)(e) === |
| PD Teesport considers some of the documented information considered in relation to your Request falls within the exception | PD Teesport considers some of the documented information considered in relation to your Request falls within the exception | ||
| Line 138: | Line 136: | ||
| - The confidentiality would be adversely affected by disclosure. | - The confidentiality would be adversely affected by disclosure. | ||
| - | //The information is commercial or industrial in nature. | + | //The information is commercial or industrial in nature.// |
| - | + | ||
| - | //ICO guidance | + | ICO guidance |
| - | nature”, as well as specific examples of commercial and industrial information. The exception applies to information | + | |
| - | about manufacturing | + | |
| - | details of regulatory information which we consider falls within the ICO’s examples of commercial information, | + | |
| - | well as technical details about a product which we would consider to be industrial information. | + | |
| - | // | + | // |
| - | //We consider | + | |
| - | necessary | + | |
| - | However, | + | |
| - | + | ||
| - | Docusign Envelope ID: C489310D-465A-8FC6-801B-545ED10BA623 | + | |
| - | + | ||
| - | + | ||
| - | {{Response%20to%20EIR%20Request%20Dr%20Gibbon%20PD%20Teesport%201%20May%202026005.png? | + | |
| - | + | ||
| - | concerns | + | We consider |
| - | confidence could be brought against PD Teesport. We are yet to hear back and will update you as soon as we can. | + | |
| | | ||
| - | //The confidentiality is protecting a legitimate economic interest. | + | //The confidentiality is protecting a legitimate economic interest.// |
| - | //ICO guidance provides a number of examples of “legitimate economic interests”, | + | ICO guidance provides a number of examples of “legitimate economic interests”, |
| - | market | + | |
| - | commercial bargaining position in the context of existing or future negotiations; | + | |
| - | reputation damage; and avoiding disclosures which would otherwise result in a loss of revenue or income”. | + | |
| - | We believe that our third party providers worked hard to ensure the continuing confidentiality of the information | + | We believe that our third party providers worked hard to ensure the continuing confidentiality of the information shared with us for the purpose of protecting their commercial interests including retaining its market position and protecting commercial valuable information from competitors and avoiding disclosures that would result in a loss of revenue. |
| - | shared with us for the purpose of protecting their commercial interests including retaining its market position and | + | |
| - | protecting commercial valuable information from competitors and avoiding disclosures that would result in a loss of | + | |
| - | revenue. | + | |
| - | possible that it would be necessary to protect such information from wider disclosure. However, as set out above, | + | |
| - | to assist you, we have consulted the relevant third parties to understand whether they have concerns about the | + | |
| - | confidentiality of the information shared with us. | + | |
| - | //The confidentiality would be adversely affected by disclosure. | + | //The confidentiality would be adversely affected by disclosure. |
| - | //Disclosure of the information into the public domain will inevitably harm the confidential nature of the information | + | Disclosure of the information into the public domain will inevitably harm the confidential nature of the information within it, and that would also harm the legitimate economic interests that identified above. |
| - | within it, and that would also harm the legitimate economic interests that identified above. | + | |
| - | Whilst we consider the information to meet the test for the exception for the reasons set out above, as we have | + | Whilst we consider the information to meet the test for the exception for the reasons set out above, as we have explained, |
| - | explained, | + | |
| - | concerns about disclosing the relevant information to you. We will update you once we have a response and will | + | |
| - | make further disclosures to you, if we are able to do so. | + | |
| - | //**Personal data – Regulation 13 EIR | + | === Personal data – Regulation 13 EIR === |
| - | **//You will note that redactions have been applied to the information that has been disclosed to you. This is because | + | You will note that redactions have been applied to the information that has been disclosed to you. This is because some of the information responsive to your Request was excepted from disclosure under Regulation 13 on the basis that it comprises |
| - | some of the information responsive to your Request was excepted from disclosure under Regulation 13 on the basis | + | |
| - | that it comprises | + | |
| - | principles set out in the data protection laws, namely that “Personal data shall be processed lawfully, fairly and in a | + | |
| - | transparent manner in relation to the data subject” (Article 5(1)(e) UK GDPR)”. | + | |
| - | + | ||
| - | PD Teesport considered the potential lawful bases available to it for disclosure of the affected personal data to you. | + | |
| - | The individuals | + | |
| - | manner, and so the only potential lawful basis under the data protection laws for making the disclosure would be | + | |
| - | that the processing | + | |
| - | requested disclosure under EIR (including trying to assist you under EIR and being transparent about PD Teesport’s | + | |
| - | compliance with its obligations). However, the lawful basis would only apply to the extent that disclosure of the | + | |
| - | relevant | + | |
| - | interests in disclosure would not be outweighed by the privacy rights and interests of affected individuals. | + | |
| - | + | ||
| - | + | ||
| - | Docusign Envelope ID: C489310D-465A-8FC6-801B-545ED10BA623 | + | |
| - | + | ||
| - | + | ||
| - | {{Response%20to%20EIR%20Request%20Dr%20Gibbon%20PD%20Teesport%201%20May%202026006.png? | + | |
| + | PD Teesport considered the potential lawful bases available to it for disclosure of the affected personal data to you. The individuals | ||
| - | Having considered the potential disclosure of affected details to the extent it relates to junior members of staff, | + | Having considered the potential disclosure of affected details to the extent it relates to junior members of staff, external |
| - | external | + | |
| - | details is not necessary for the legitimate interests identified by PD Teesport. | + | |
| - | They would not add to your understanding | + | They would not add to your understanding |
| - | reasonable | + | |
| - | disclosed publicly in response to the Request. As such, disclosure of this information is not necessary for legitimate | + | |
| - | interests | + | |
| - | individuals due to disclosure of their personal data to you. Therefore, we do not consider that the lawful basis of | + | |
| - | legitimate | + | |
| - | meaning that the exception under Regulation 13 applies. | + | |
| - | However, | + | However, |
| - | individuals in public roles at PD Teesport was disclosed wherever possible. | + | |
| - | **Your right of complaint | + | ==== Your right of complaint |
| - | **If you have any concerns about this response, or any complaints about the handling of your Request to date, we | + | If you have any concerns about this response, or any complaints about the handling of your Request to date, we offer an internal review (complaints) procedure. |
| - | offer an internal review (complaints) procedure. | + | |
| - | If you wish to use our internal review procedure, please contact Richard Ellison at dpo@pdports.co.uk. In the internal | + | If you wish to use our internal review procedure, please contact Richard Ellison at dpo@pdports.co.uk. In the internal review procedure, your Request and our decision will be reviewed by a member of our organisation who had no input in the original decision. We will aim to conclude our internal review process within 20 working days of receiving your complaint. We will inform you if we consider that this timescale is unlikely to be complied with and will inform you of a likely response date. |
| - | review procedure, your Request and our decision will be reviewed by a member of our organisation who had no | + | |
| - | input in the original decision. We will aim to conclude our internal review process within 20 working days of receiving | + | |
| - | your complaint. We will inform you if we consider that this timescale is unlikely to be complied with and will inform | + | |
| - | you of a likely response date. | + | |
| - | If you are still not satisfied following this, you can raise a concern with the Information Commission. The contact | + | If you are still not satisfied following this, you can raise a concern with the Information Commission. The contact details are: |
| - | details are: | + | |
| Information Commission | Information Commission | ||
| Line 245: | Line 183: | ||
| SK9 5AF | SK9 5AF | ||
| Tel: 0303 123 1113 | Tel: 0303 123 1113 | ||
| - | Website: http:%%//%%ico.org.uk | + | Website: http:// |
| Kind regards | Kind regards | ||
| Richard Ellison | Richard Ellison | ||
| - | Data Protection Officer | ||
| - | PD Teesport Limited | ||
| - | |||
| - | Enclosures | ||
| - | Docusign Envelope ID: C489310D-465A-8FC6-801B-545ED10BA623 | + | ===== Analysis ===== |
| + | |||
| + | No information has been supplied which suggests that any environmental impact assessment is carried out on the maintenance dredging operation. | ||
| + | |||
| + | A trailing suction hopper dredger presents two sources of contamination: | ||
| + | - the dredge head resuspending material which is not captured in the suction (up to 20% of dredged amount) | ||
| + | - the overflow from the hopper (up to 25% of the dredged amount) | ||
| + | |||
| + | The response confirms that overflow happens every time the dredgers are deployed, but despite operating within the Tees SSSI, SPA and Ramsar, does not show any definition of the pathways when operating within the river. | ||
| + | |||
| + | There is no evidence of a least significant effect appraisal of the maintenance dredging operations. | ||
| + | ==== 1. Trailing Suction Hopper Dredger (TSHD) Operational Data ==== | ||
| + | - Dredge logs - 1 supplied for 20th December 2025 - no information on overflowing. | ||
| + | - Green valve - no information supplied as considered commercially sensitive. | ||
| + | - Proof of environmental sustainability of dredging operations - no information supplied as considered commercially sensitive. | ||
| + | |||
| + | ==== 2. Estuarine Plume Modelling and Hydrodynamics ==== | ||
| + | - Plume dynamics from overflow - no information held. | ||
| + | - Sediment trap effect - no information held. | ||
| + | ==== 3. Contaminant Partitioning and "Fine Fraction" | ||
| + | - Chemical analysis of overflow fraction - no information help. | ||
| + | - TOC for mid-licence sampling - MMO templates supplied. | ||
| + | ==== 4. Water Framework Directive (WFD) and Protected Sites ==== | ||
| + | - WFD compliance for extraction phase of dredging - pointed to previous WFD for disposal. | ||
| + | - Dredging induced turbidity impact on terns etc. - MDP and should look at the [[https:// | ||
| + | - Records of turbidity / dissolved oxygen - PD Teesport holds no records. | ||
| + | - Test of likely significance SPA - MDP and extension of SPA. Without plume modelling once again these documents refer to the disposal not the dredging operation. | ||