teesworks_-_capital_dredging_the_tees [2024/07/15 09:40] – [Teesside South Bank Dredging 11th October 2022] nefcadminteesworks_-_capital_dredging_the_tees [2026/08/21 12:01] (current) – [Introduction] nefcadmin
Line 6: Line 6:
 [[https://beyondplanb.eu/projects/project_bilbao.html|{{https://beyondplanb.eu/media/images/originals/bil_r02_13.jpg}}]]  [[https://beyondplanb.eu/projects/project_bilbao.html|{{https://beyondplanb.eu/media/images/originals/bil_r02_13.jpg}}]] 
  
-[[https://en.wikipedia.org/wiki/File:Bilbao_-_Ria.jpg|{{https://upload.wikimedia.org/wikipedia/commons/thumb/7/7f/Bilbao_-_Ria.jpg/640px-Bilbao_-_Ria.jpg_-_Ria.jpg}}]]+{{https://upload.wikimedia.org/wikipedia/commons/thumb/7/7f/Bilbao_-_Ria.jpg/1920px-Bilbao_-_Ria.jpg?utm_source=en.wikipedia.org&utm_campaign=imageinfo&utm_content=thumbnail}} 
  
 Teesworks approach does not compare well to best in class nationally and certainly not internationally.  For example, the approach to dredging for the Teesworks South Bank Quay development is a very visible demonstration of the lack of ambition being shown by Teesworks, through what appears to be substandard operations, where speed and low cost seem to trump any heritage/environmental considerations.  South Bank Quay will create much needed jobs in a sector that really supports the UK's need to move to Net Zero, but the jobs could have been equally created with a protective/precautionary approach to the environment and respect for local heritage.  Instead, a short sighted approach where short terms profits both financial and political appear to have been prioritised over real sustainable long term benefits. Teesworks approach does not compare well to best in class nationally and certainly not internationally.  For example, the approach to dredging for the Teesworks South Bank Quay development is a very visible demonstration of the lack of ambition being shown by Teesworks, through what appears to be substandard operations, where speed and low cost seem to trump any heritage/environmental considerations.  South Bank Quay will create much needed jobs in a sector that really supports the UK's need to move to Net Zero, but the jobs could have been equally created with a protective/precautionary approach to the environment and respect for local heritage.  Instead, a short sighted approach where short terms profits both financial and political appear to have been prioritised over real sustainable long term benefits.